Mid-Infrared Beamline @ CLS
  • Science
    • Science Highlights
    • Publications
    • Talks
  • People
    • Beamline Team
    • Mid-Infrared Group
    • Contact us
  • Beamline
    • About
    • Safety
    • Equipment
    • Experimental Techniques
    • Beamline Performance
      • Beamline Cams
    • Computers and Data
    • Links
    • FAQ
  • Downloads
  • Guides
    • Proposal submission guide
    • Experimental Permits
    • Permit Ammendments
  • Tools
    • Unit Converter
    • Band Position ↔ Frequency
    • Thickness Calculator
  • Schedule
    • Request Resources
  • Jobs

Home / 2011

Yearly Archive for: ‘2011’

Job postings Comments Off

The summer student job postings are advertised on the beamline webpage (http://midir.lightsource.ca/jobs) and the main CLS page (http://www.lightsource.ca/careers/summer_opportunities.php) as well. We are looking forward to receiving applications!

Posted on: 12-6-2011
Posted in: General

Online again! Comments Off

So, it took us two days to get it done. Impressive, isn’t it? Tonight at around midnight we go beam on the FPA and then shortly after that signal on the 100 micron MCT as well. Of course there is a lot of fine tuning ahead, but that will be nothing compared to this.

The new system looks and more importantly works really nice…

Pictures of the whole process are coming soon.

Posted on: 03-2-2011
Posted in: General

Shutdown Comments Off

The beamline is off from tomorrow morning. We are going to take the “old” 66v offline (for a while) and clean up the space for the new Vertex 70v. The Bruker engineers are coming next Monday to install the new system which will bring a lot of features to the Mid-IR beamline and our users.

In the near future we will start designing our second branchline to bring the 66v back to the synchrotron and to double our capabilities. We’ll keep you posted.

Posted on: 02-24-2011
Posted in: General

Vertex 70v Comments Off

The new Bruker Vertex 70v spectrometer is here. At the moment in boxes, but the installation is coming soon.

Posted on: 01-7-2011
Posted in: General
The latest tweet from the CLS Floor Coordinators:
  • 07:55 SM beamline requested 10 min delay before shutdown. Réglage de la source à / machine studies at 08:10. SM --3 hours ago

Some of our pages are still under construction and being updated.
If you have any questions or comments please contact us...

Copyright Status

DISCLAIMER OF ENDORSEMENT: Reference herein to any specific commercial products, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favouring by the Canadian Light Source or the University of Saskatchewan. The views and opinions of authors expressed herein do not necessarily state or reflect those of the Canadian Light Source or the University of Saskatchewan, and shall not be used for advertising or product endorsement purposes.
DISCLAIMER OF LIABILITY: With respect to documents available from this server, neither the Canadian Light Source nor the University of Saskatchewan nor any of their employees, makes any warranty, express or implied, including the warranties of merchantability and fitness for a particular purpose, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights.
The background was created from an image originally designed by monkeymagico.
The website is powered by the Wordpress engine with a modified Awake theme.
© 2010 Mid Infrared Beamline, Canadian Light Source Inc.
  • Admin